Beale AFB Airfield Lighting Project
Project Name: Airfield Lighting
Project Location: Beale AFB, CA
Project Status: Design Stage
Submit a Subcontractor Profile
Proposed Schedule
Anticipated Design Complete by May 2011
Anticipated Construction: May-Dec 2011
Anticipated Date of 65% Construction Drawings: Jan-Feb 2011
Documents - Secure Download
- 65% Design Set
- Statement ofWork/Bid Sheet
- Design Analysis
Services We Will Be Looking For:
Airfield Electrical Services - See Statement ofWork
Insurance and Bonding Requirements
Bonds Will Be Required From All Major Subcontractors
1) Comprehensive Auto Liability and Property Damage Insurance:
$1,000,000 - Bodily Injury and Property Damage Combined Single Limit.
2) Comprehensive General Liability and Property Damage Insurance:
$1,000,000 - Personal Injury and Property Damage Combined Single Limit:
$2,000,000 - General Aggregate; $2,000,000 - Products-Completed
Operations Aggregate.
3) Current Worker's Compensation Insurance through the subcontractor's insurer
or the California State Fund..
Contact Information
Chris Slater
Komada, LLC
505 6th Street, Suite A
Marysville, CA 95901
Phone: 530-216-4081
Cell: 530-308-1417
Email: chris.slater@mailhosts.com
|